skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Waste Receiving and Processing Facility, Module 1: Volume 6, Engineering assessments

Technical Report ·
OSTI ID:10148693

This report evaluates the ability of the WRAP Module 1 Facility to achieve the required material throughput by developing a time and motion simulation model of the facility using the WITNESS Simulation Program. Analysis of the simulation model indicated that the required throughput of 6825 drums per year based on working 5.5 hours in the Shipping & Receiving and Waste Process areas and 7 hours in the NDA/NDE area for 175 days a year, as stated in the Functional Design Criteria (FDC) Rev. 1 and Supplemental Design Requirements Document (SDRD) Rev. 1, can be achieved.

Research Organization:
United Engineers and Constructors, Inc., Englewood, CO (United States). Western Operations
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-91RL11946
OSTI ID:
10148693
Report Number(s):
DOE/RL/11946-1-Vol.6; ON: DE92015020
Resource Relation:
Other Information: PBD: Mar 1992
Country of Publication:
United States
Language:
English