Waste Receiving and Processing Facility, Module 1: Volume 6, Engineering assessments
Technical Report
·
OSTI ID:10148693
This report evaluates the ability of the WRAP Module 1 Facility to achieve the required material throughput by developing a time and motion simulation model of the facility using the WITNESS Simulation Program. Analysis of the simulation model indicated that the required throughput of 6825 drums per year based on working 5.5 hours in the Shipping & Receiving and Waste Process areas and 7 hours in the NDA/NDE area for 175 days a year, as stated in the Functional Design Criteria (FDC) Rev. 1 and Supplemental Design Requirements Document (SDRD) Rev. 1, can be achieved.
- Research Organization:
- United Engineers and Constructors, Inc., Englewood, CO (United States). Western Operations
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-91RL11946
- OSTI ID:
- 10148693
- Report Number(s):
- DOE/RL/11946-1-Vol.6; ON: DE92015020
- Resource Relation:
- Other Information: PBD: Mar 1992
- Country of Publication:
- United States
- Language:
- English
Similar Records
Waste Receiving and Processing Facility, Module 1: Volume 6, Engineering assessments
Time and motion simulation of the WRAP Module 1 Facility
Time and motion simulation of the WRAP Module 1 Facility
Technical Report
·
Sun Mar 01 00:00:00 EST 1992
·
OSTI ID:10148693
Time and motion simulation of the WRAP Module 1 Facility
Conference
·
Mon Feb 01 00:00:00 EST 1993
·
OSTI ID:10148693
Time and motion simulation of the WRAP Module 1 Facility
Conference
·
Mon Feb 01 00:00:00 EST 1993
·
OSTI ID:10148693