Double-shell tank waste transfer facilities integrity assessment plan
This document presents the integrity assessment plan for the existing double-shell tank waste transfer facilities system in the 200 East and 200 West Areas of Hanford Site. This plan identifies and proposes the integrity assessment elements and techniques to be performed for each facility. The integrity assessments of existing tank systems that stores or treats dangerous waste is required to be performed to be in compliance with the Washington State Department of Ecology Dangerous Waste Regulations, Washington Administrative Code WAC-173-303-640 requirements.
- Research Organization:
- Fluor Daniel Hanford Inc., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States); USDOE Assistant Secretary for Environment, Safety, and Health, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 10148478
- Report Number(s):
- HNF--3008; ON: DE99050811; BR: EW3120074
- Country of Publication:
- United States
- Language:
- English
Similar Records
1998 242-A interim evaporator tank system integrity assessment plan
Integrity assessment plan for PNL 300 area radioactive hazardous waste tank system. Final report
B Plant low level waste system integrity assessment report
Technical Report
·
Mon Mar 30 23:00:00 EST 1998
·
OSTI ID:348856
Integrity assessment plan for PNL 300 area radioactive hazardous waste tank system. Final report
Technical Report
·
Thu Feb 29 23:00:00 EST 1996
·
OSTI ID:211343
B Plant low level waste system integrity assessment report
Technical Report
·
Fri Sep 01 00:00:00 EDT 1995
·
OSTI ID:447984