Project W-314 specific test and evaluation plan for 241-AY-02A pump pit upgrade
This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-02A Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-02A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP).
- Research Organization:
- Fluor Daniel Hanford Inc., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 10148320
- Report Number(s):
- TWR--2613; ON: DE99050687; BR: EW3130010
- Country of Publication:
- United States
- Language:
- English
Similar Records
Project W-314 specific test and evaluation plan for 241-AY-01A pump pit upgrade
Project W-314 specific test and evaluation plan for SN-635 transfer line (241-AY-01A to 241-AY-02A) and SN-633 transfer line tie in
Project W-314 Specific Test and Evaluation Plan 241-AN-B Valve Pit
Technical Report
·
Tue May 19 00:00:00 EDT 1998
·
OSTI ID:10148330
Project W-314 specific test and evaluation plan for SN-635 transfer line (241-AY-01A to 241-AY-02A) and SN-633 transfer line tie in
Technical Report
·
Tue May 19 00:00:00 EDT 1998
·
OSTI ID:10148325
Project W-314 Specific Test and Evaluation Plan 241-AN-B Valve Pit
Technical Report
·
Wed Aug 25 00:00:00 EDT 1999
·
OSTI ID:797656