Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

IPD production projections. Revision

Technical Report ·
DOI:https://doi.org/10.2172/10147196· OSTI ID:10147196

The attached tables are an extension of the data that will be used in the forthcoming Production Studies. It considers thorium load substitution for the natural uranium cases previously reported. The power level, operating efficiency, exposure, conversion ratios, tonnage, and production are given for the natural U loading, blanket loading, and full conversion. The small reactors, the C reactor, and the K reactor are considered.

Research Organization:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
10147196
Report Number(s):
HW--82977-RD-3-Rev.; ON: DE94010977
Country of Publication:
United States
Language:
English

Similar Records

IPD production projections
Technical Report · Sat Jul 18 00:00:00 EDT 1964 · OSTI ID:10147199

IPD production projections
Technical Report · Tue Aug 04 00:00:00 EDT 1964 · OSTI ID:10170762

Preliminary hazards evaluation for enriched uranium-thoria (E-Q) loading: Hanford IPD reactors
Technical Report · Thu Jul 23 00:00:00 EDT 1964 · OSTI ID:10168069