Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Speed-of-control limits, 105-DR

Technical Report ·
DOI:https://doi.org/10.2172/10146614· OSTI ID:10146614
The current operating conditions at 105-DR, because of the recent Ball 3X drop, dictate temporary lower speed-of-control limits. While is si still not expected that this reactor will be limited by the speed-of- control criterion, it is felt that the limit curves have been temporarily sufficiently reduced as to warrant publication of former limits. Limit curves as a function of weighted graphite temperature for the continuous and block discharge schemes are included in this document. The two sources of the reduction in the speed-of-control limit comes from two sources: (1) While the limit is commonly expressed in MW of pile power level, it is actually a function of maximum tube power, (2) The poisoning effect of the balls lodged in the stack has been estimated at about 15 mk.
Research Organization:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
10146614
Report Number(s):
HW--70630; ON: DE94010923
Country of Publication:
United States
Language:
English