skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: RELAP5/MOD2 analysis of a postulated ``cold leg SBLOCA`` simultaneous to a ``total black-out`` event in the Jose Cabrera Nuclear Station

Technical Report ·
OSTI ID:10146143
 [1]
  1. Union Electrica, SA, Madrid (Spain)

Several beyond-design bases cold leg small-break LOCA postulated scenarios based on the ``lessons learned`` in the OECD-LOFT LP-SB-3 experiment have been analyzed for the Westinghouse single loop Jose Cabrera Nuclear Power Plant belonging to the Spanish utility UNION ELECTRICA FENOSA, S.A. The analysis has been done by the utility in the Thermal-Hydraulic & Accident Analysis Section of the Engineering Department of the Nuclear Division. The RELAP5/MOD2/36.04 code has been used on a CYBER 180/830 computer and the simulation includes the 6 in. RHRS charging line, the 2 in. pressurizer spray, and the 1.5 in. CVCS make-up line piping breaks. The assumption of a ``total black-out condition`` coincident with the occurrence of the event has been made in order to consider a plant degraded condition with total active failure of the ECCS. As a result of the analysis, estimates of the ``time to core overheating startup`` as well as an evaluation of alternate operator measures to mitigate the consequences of the event have been obtained. Finally a proposal for improving the LOCA emergency operating procedure (E-1) has been suggested.

Research Organization:
Nuclear Regulatory Commission, Washington, DC (United States). Office of Nuclear Regulatory Research; Union Electrica, SA, Madrid (Spain)
Sponsoring Organization:
Nuclear Regulatory Commission, Washington, DC (United States)
OSTI ID:
10146143
Report Number(s):
NUREG/IA-0075; ON: TI92014259; IN: ICSP-JC-SB3-R
Resource Relation:
Other Information: PBD: Apr 1992
Country of Publication:
United States
Language:
English