Design criteria: Reactor plant modification -- Project CG-558 and 100-C Area Alterations -- Project CG-600. Volume 1, Revision 1
This document defines the basic criteria to be used in the preparation of detailed design for Project CG-558, Reactor Plant Modification for Increased Production and for Project CG-600, 100-C Area Alterations. It has been determined that the most economical method of increasing plutonium production within the next five years is by the modernization and improvement of the 100-B, 100-C, 100-D, 100-DR, 100-F, and 100-H reactor plants. These reactors are currently incapable of operating at their maximum potential power levels because of a limited availability of process cooling water. As a result of this program, it is estimated that 1650-2350 megawatts of total additional production will be achieved.
- Research Organization:
- General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-76RL01830
- OSTI ID:
- 10137609
- Report Number(s):
- HW--30401-Vol.1-Rev.1; ON: DE93009979
- Country of Publication:
- United States
- Language:
- English
Similar Records
Design criteria -- Reactor plant modifications for increased production and 100-C Area Alterations (Sections A and B) CG-558. Volume 1
Hazards summary report -- Projects CG-558 and CG-600 reactor plant modifications. Volume 1, Revision
Hazards summary report: Projects CG-558 and CG-600 reactor plant modifications. Volume 1
Technical Report
·
Tue Aug 10 00:00:00 EDT 1954
·
OSTI ID:10122339
Hazards summary report -- Projects CG-558 and CG-600 reactor plant modifications. Volume 1, Revision
Technical Report
·
Tue Mar 05 19:00:00 EST 1957
·
OSTI ID:10185917
Hazards summary report: Projects CG-558 and CG-600 reactor plant modifications. Volume 1
Technical Report
·
Thu Dec 20 19:00:00 EST 1956
·
OSTI ID:10188017