Substation Reliability Centered Maintenance (RCM) is a technique that is used to develop maintenance plans and criteria so the operational capability of substation equipment is achieved, restored, or maintained. The objective of the RCM process is to focus attention on system equipment in a manner that leads to the formulation of an optimal maintenance plan. The RCM concept originated in the airline industry in the 1970s and has been used since 1985 to establish maintenance requirements for nuclear power plants. The RCM process is initially applied during the design and development phase of equipment or systems on the premise that reliability is a design characteristic. It is then reapplied, as necessary, during the operational phase to sustain a more optimal maintenance program based on actual field experiences. The purpose of the RCM process is to develop a maintenance program that provides desired or specified levels of operational safety and reliability at the lowest possible overall cost. The objectives are to predict or detect and correct incipient failures before they occur or before they develop into major defects, reduce the probability of failure, detect hidden problems, and improve the cost-effectiveness of the maintenance program. RCM accomplishes two basic purposes: (1) It identifies in real-time incipient equipment problems, averting potentially expensive catastrophic failures by communicating potential problems to appropriate system operators and maintenance personnel. (2) It provides decision support by recommending, identifying, and scheduling preventive maintenance. Recommendations are based on maintenance criteria, maintenance history, experience with similar equipment, real-time field data, and resource constraints. Hardware and software are used to accomplish these two purposes. The RCM system includes instrumentation that monitors critical substation equipment as well as computer software that helps analyze equipment data.
- Research Organization:
- Oak Ridge National Lab., TN (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC05-84OR21400
- OSTI ID:
- 10136644
- Report Number(s):
- CONF-9211102--2; ON: DE93007918
- Country of Publication:
- United States
- Language:
- English
Similar Records
Substation Reliability Centered Maintenance
Reliability centered maintenance (RCM) for substations project overview
Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration
Conference
·
Sat Oct 31 23:00:00 EST 1992
·
OSTI ID:6668764
Reliability centered maintenance (RCM) for substations project overview
Technical Report
·
Thu Aug 01 00:00:00 EDT 1996
·
OSTI ID:430392
Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration
Technical Report
·
Thu May 28 00:00:00 EDT 1992
·
OSTI ID:10158611