Integrated coal preparation and CWF processing plant: Conceptual design and costing. Final technical report
- Science Applications International Corp., McLean, VA (United States)
- Roberts and Schaefer Co., Salt Lake City, UT (United States)
At the request of the US Department of Energy (DOE), Pittsburgh Energy Technology Center, a study was conducted to provide DOE with a reliable, documented estimate of the cost of producing coal-water fuel (CWF). The approach to the project was to specify a plant capacity and location, identify and analyze a suitable coal, and develop a conceptual design for an integrated coal preparation and CWF processing plant. Using this information, a definitive costing study was then conducted, on the basis of which an economic and sensitivity analysis was performed utilizing a financial evaluation model to determine a price for CWF in 1992. The design output of the integrated plant is 200 tons of coal (dry basis) per hour. Operating at a capacity factor of 83 percent, the baseline design yields approximately 1.5 million tons per year of coal on a dry basis. This is approximately equivalent to the fuel required to continuously generate 500 MW of electric power. The CWF produced by the plant is intended as a replacement for heavy oil or gas in electric utility and large industrial boilers. The particle size distribution, particularly the top size, and the ash content of the coal in the CWF are specified at significantly lower levels than is commonly found in typical pulverized coal grinds. The particle top size is 125 microns (vs typically 300m{mu} for pulverized coal) and the coal ash content is 3.8 percent. The lower top size is intended to promote complete carbon burnout at less derating in boilers that are not designed for coal firing. The reduced mineral matter content will produce ash of very fine particle size during combustion, which leads to less impaction and reduced fouling of tubes in convective passages.
- Research Organization:
- Burns and Roe Services Corp., Pittsburgh, PA (United States); Science Applications International Corp., McLean, VA (United States); Roberts and Schaefer Co., Salt Lake City, UT (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC22-89PC88400
- OSTI ID:
- 10136430
- Report Number(s):
- DOE/PC/88400--T2; ON: DE93011026
- Country of Publication:
- United States
- Language:
- English
Similar Records
Integrated coal preparation and CWF processing plant: Conceptual design and costing
Integrated coal preparation and CWF processing plant
Economic evaluation of microfine coal-water slurry: Final report
Technical Report
·
Mon Nov 30 23:00:00 EST 1992
·
OSTI ID:6640551
Integrated coal preparation and CWF processing plant
Conference
·
Thu Dec 30 23:00:00 EST 1993
·
OSTI ID:45111
Economic evaluation of microfine coal-water slurry: Final report
Technical Report
·
Sun Nov 30 23:00:00 EST 1986
·
OSTI ID:6976882