Forrestal Building Lighting Retrofit Second Live Test Demonstration (LTD)

Technical Report ·
DOI:https://doi.org/10.2172/10135995· OSTI ID:10135995
This report describes and summarizes the Forrestal Building Lighting Retrofit Live Test demonstration (LTD) performed by Pacific Northwest Laboratory (PNL) in Room 5E-080 of the DOE Forrestal Building in Washington, D.C. The purpose of the LTD was to evaluate proposed lighting retrofits for compliance with the requirements laid out in the request for proposal (RFP) for the Shared Energy Savings (SES) Lighting Retrofit Project for the Forrestal Building, Washington, D.C. Testing was conducted from March 9 through March 18, 1992, and again on August 3 through August 6, 1992. Four contractors were initially tested in March. Then, two contractors were retested in August due to changes in the rebate schedule for electronic ballasts being offered by the Potomac Electric Power Company (PEPCO), the utility servicing the Forrestal Building. The two contractors tested in March were retested with different ballasts, tubes, and reflectors. The results from these new tests are reported here and compared with those from the earlier tests.
Research Organization:
Pacific Northwest Lab., Richland, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
10135995
Report Number(s):
PNL--8540; ON: DE93009088
Country of Publication:
United States
Language:
English