skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: RHIC BBLR measurements in 2009

Conference ·
OSTI ID:1013481

Long range beam-beam experiments were conducted during the Run 2009 in the Yellow and the Blue beams of the RHIC accelerator with DC wires. The effects of a long-range interaction with a DC wire on colliding and non-colliding bunches with the aid of beam losses, orbits, tunes were studied. Results from distance scans and an attempt to compensate a long-range interaction with a DC wire is presented. Two DC wires in the vertical plane were installed in the RHIC accelerator in 2006 with the aim of investigating long range (LR) beam-beam effects and a potential compensation. Extensive experiments were conducted focusing mainly on the effect of a wire on single ion beams from 2006-2009. A unique opportunity to compare the effect of the wire on colliding beams and compensation of a single LR beam-beam interaction were conducted in Run2009 with protons at 100 GeV. Due to aperture considerations for decreasing {beta}*, the Blue wire was removed during the shutdown after the Run2009 and the Yellow wire is foreseen to be removed in the near future. Therefore, these experiments serve as the final set of measurements for LR beam-beam with RHIC as a test bed. The relevant RHIC beam and lattice parameters are listed in Table 1 for the experiments in Run2009.

Research Organization:
Brookhaven National Lab. (BNL), Upton, NY (United States). Relativistic Heavy Ion Collider (RHIC)
Sponsoring Organization:
DOE - Office Of Science
DOE Contract Number:
DE-AC02-98CH10886
OSTI ID:
1013481
Report Number(s):
BNL-90760-2010-CP; R&D Project: KBCH139; KB0202011; TRN: US1102480
Resource Relation:
Conference: First International Particle Accelerator Conference (IPAC) 2010; Kyoto, Japan; 20100523 through 20100528
Country of Publication:
United States
Language:
English

Similar Records

Long-Range Beam-Beam Compensation in RHIC
Conference · Sat May 01 00:00:00 EDT 2010 · Conf.Proc.C100523:TUPD065,2010 · OSTI ID:1013481

Required Accuracy of the RHIC Circumference
Technical Report · Mon Jul 19 00:00:00 EDT 1993 · OSTI ID:1013481

RHIC Spin Flipper Commissioning Status
Conference · Sun May 23 00:00:00 EDT 2010 · OSTI ID:1013481