Title: Quality assurance plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

Abstract

This Quality Assurance Plan (QAP) is concerned with design and construction (Sect. 2) and characterization and monitoring (Sect. 3). The basis for Sect. 2 is the Quality Assurance Plan for the Design and Construction of Waste Area Grouping 6 Closure at Oak Ridge National Laboratory, Oak Ridge, Tennessee, and the basis for Sect. 3 is the Environmental Restoration Quality Program Plan. Combining the two areas into one plan gives a single, overall document that explains the requirements and from which the individual QAPs and quality assurance project plans can be written. The Waste Area Grouping (WAG) 6 QAP establishes the procedures and requirements to be implemented for control of quality-related activities for the WAG 6 project. Quality Assurance (QA) activities are subject to requirements detailed in the Martin Marietta Energy Systems, Inc. (Energy Systems), QA Program and the Environmental Restoration (ER) QA Program, as well as to other quality requirements. These activities may be performed by Energy Systems organizations, subcontractors to Energy Systems, and architect-engineer (A-E) under prime contract to the US Department of Energy (DOE), or a construction manager under prime contract to DOE. This plan specifies the overall Energy Systems quality requirements for the project. The WAG 6more » QAP will be supplemented by subproject QAPs that will identify additional requirements pertaining to each subproject.« less

Publication Date:
Research Org.:
Oak Ridge National Lab., TN (United States); Gilbert/Commonwealth, Inc., Knoxville, TN (United States)
Sponsoring Org.:
USDOE, Washington, DC (United States)
OSTI Identifier:
10132570
Report Number(s):
ORNL/ER-164
ON: DE94008063; TRN: 94:005687
DOE Contract Number:
AC05-84OR21400
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: Jan 1994
Country of Publication:
United States
Language:
English
Subject:
11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS; 12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; 29 ENERGY PLANNING, POLICY AND ECONOMY; ORNL; REMEDIAL ACTION; QUALITY ASSURANCE; US SUPERFUND; COMPLIANCE; PLANNING; RADIOACTIVE WASTES; HAZARDOUS MATERIALS; 054000; 052002; 290600; HEALTH AND SAFETY; WASTE DISPOSAL AND STORAGE; NUCLEAR ENERGY

Citation Formats

Not Available. Quality assurance plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. United States: N. p., 1994. Web. doi:10.2172/10132570.
Not Available. Quality assurance plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. United States. doi:10.2172/10132570.
Not Available. 1994. "Quality assurance plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee". United States. doi:10.2172/10132570. https://www.osti.gov/servlets/purl/10132570.
@article{osti_10132570,
title = {Quality assurance plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee},
author = {Not Available},
abstractNote = {This Quality Assurance Plan (QAP) is concerned with design and construction (Sect. 2) and characterization and monitoring (Sect. 3). The basis for Sect. 2 is the Quality Assurance Plan for the Design and Construction of Waste Area Grouping 6 Closure at Oak Ridge National Laboratory, Oak Ridge, Tennessee, and the basis for Sect. 3 is the Environmental Restoration Quality Program Plan. Combining the two areas into one plan gives a single, overall document that explains the requirements and from which the individual QAPs and quality assurance project plans can be written. The Waste Area Grouping (WAG) 6 QAP establishes the procedures and requirements to be implemented for control of quality-related activities for the WAG 6 project. Quality Assurance (QA) activities are subject to requirements detailed in the Martin Marietta Energy Systems, Inc. (Energy Systems), QA Program and the Environmental Restoration (ER) QA Program, as well as to other quality requirements. These activities may be performed by Energy Systems organizations, subcontractors to Energy Systems, and architect-engineer (A-E) under prime contract to the US Department of Energy (DOE), or a construction manager under prime contract to DOE. This plan specifies the overall Energy Systems quality requirements for the project. The WAG 6 QAP will be supplemented by subproject QAPs that will identify additional requirements pertaining to each subproject.},
doi = {10.2172/10132570},
journal = {},
number = ,
volume = ,
place = {United States},
year = 1994,
month = 1
}

Technical Report:

Save / Share:
  • The Oak Ridge National Laboratory (ORNL) Waste Area Grouping (WAG) 2 Site Investigation (SI)includes the lower portion of the White Oak Creek (WOC) drainage and enbayment, and associated floodplain and subsurface environment. The ORNL main plant and the major waste storage and disposal facilities at ORNL are located in the WOC watershed and are drained by the WOC system to the Clinch River, located off-site. Environmental media are contaminated and continue to receive contaminants from hydrologically upgradient WAGS. WAG 2 is important as a conduit from upgradient areas to the Clinch River. The general objectives of the WAG 2 SImore » Project are to conduct a multimedia monitoring and characterization program to define and monitor the input of contaminants from adjacent WAGS, monitor and gather sufficient information for processes controlling or driving contaminant fluxes to construct an appropriate conceptual model for WAG 2, and prepare for the eventual remediation of WAG 2.« less
  • The WAG 6 Closure Quality Assurance Plan establishes the procedures and requirements to be implemented for control of quality-related activities for the WAG 6 Closure project that are subject to the application of the Martin Marietta Energy Systems, Inc. (Energy Systems) QA Program, the Environmental Restoration Division QA Program, and other quality requirements. These activities may be performed by Energy Systems organizations, a subcontractor to Energy Systems, an architect-engineer (A-E) under prime contract to the Department of Energy (DOE), and/or a construction manager under prime contract to DOE. This plan specifies the overall Energy Systems Engineering quality requirements for themore » project. The WAG 6 Closure QA Plan will be supplemented by subproject QA plans that will identify additional requirements pertaining to each subproject.« less
  • The Oak Ridge National Laboratory (ORNL) Waste Area Grouping (WAG) 2 Site Investigation (SI)includes the lower portion of the White Oak Creek (WOC) drainage and enbayment, and associated floodplain and subsurface environment. The ORNL main plant and the major waste storage and disposal facilities at ORNL are located in the WOC watershed and are drained by the WOC system to the Clinch River, located off-site. Environmental media are contaminated and continue to receive contaminants from hydrologically upgradient WAGS. WAG 2 is important as a conduit from upgradient areas to the Clinch River. The general objectives of the WAG 2 SImore » Project are to conduct a multimedia monitoring and characterization program to define and monitor the input of contaminants from adjacent WAGS, monitor and gather sufficient information for processes controlling or driving contaminant fluxes to construct an appropriate conceptual model for WAG 2, and prepare for the eventual remediation of WAG 2.« less
  • The WAG 6 Closure Quality Assurance Plan establishes the procedures and requirements to be implemented for control of quality-related activities for the WAG 6 Closure project that are subject to the application of the Martin Marietta Energy Systems, Inc. (Energy Systems) QA Program, the Environmental Restoration Division QA Program, and other quality requirements. These activities may be performed by Energy Systems organizations, a subcontractor to Energy Systems, an architect-engineer (A-E) under prime contract to the Department of Energy (DOE), and/or a construction manager under prime contract to DOE. This plan specifies the overall Energy Systems Engineering quality requirements for themore » project. The WAG 6 Closure QA Plan will be supplemented by subproject QA plans that will identify additional requirements pertaining to each subproject.« less
  • Waste Area Grouping (WAG) 6 is a hazardous and low-level radioactive waste disposal site at Oak Ridge National Laboratory (ORNL). Extensive site investigations have revealed contaminated surface water, sediments, groundwater, and soils. Based on the results of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) conducted from 1989--1991 and on recent interactions with the US Environmental Protection Agency (EPA) and the Tennessee Department of Environment and Conservation (TDEC), a decision was made to defer implementing source control remedial measures at the WAG. The information shows WAG 6 contributes < 2% of the total off-site contaminant risk released overmore » White Oak Dam (WOD). The alternative selected to address hazards at WAG 6 involves maintenance of site access controls to prevent public exposure to on-site contaminants, continued monitoring of contaminant releases to determine if source control measures will be required in the future, and development of technologies to support final remediation of WAG 6. This Quality Assurance Project Plan (QAPjP) has been developed as part of the Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee (DOE/OR/01-1192&D1). Environmental monitoring will be conducted in two phases: the baseline monitoring phase and the routine annual monitoring phase. The baseline monitoring phase will be conducted to establish the baseline contaminant release conditions at the Waste Area Grouping (WAG), to confirm the site-related chemicals of concern (COC), and to gather data to confirm the site hydrologic model. The baseline monitoring phase is expected to begin in 1994 and continue for 12-18 months. The routine annual monitoring phase will consist of continued sampling and analyses of COC to determine off-WAG contaminant flux, to identify trends in releases, and to confirm the COC. The routine annual monitoring phase will continue for {approximately}4 years.« less