Impact evaluation of lighting retrofit projects at Boeing Commercial Airplane Group under The Energy $avings Plan
This impact evaluation of two lighting retrofit projects that were recently installed at Boeing Commercial Airplane Group (Boeing) was conducted for the Bonneville Power Administration (Bonneville) as part of an evaluation of its Energy $avings Plan (E$P) Program. The first project was a light-fixture and lighting control retrofit, consisting of five individual measures installed in Building 40-05. The second project was a retrofit of all parking lot lighting on the site. The objective of this impact evaluation was to assess how much electrical energy is being saved at Boeing as a result of the E$P projects and to determine how much the savings cost Bonneville and the region. The impact of the project was evaluated with a combination of engineering analysis, financial analysis, interviews, and submittal reviews (Boeing`s proposals and completion reports).
- Research Organization:
- Pacific Northwest Lab., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-76RL01830
- OSTI ID:
- 10132293
- Report Number(s):
- PNL--8834; ON: DE94008057
- Country of Publication:
- United States
- Language:
- English
Similar Records
Impact evaluation of adjustable speed drives installed at Great Western Malting Company under the Energy $avings Plan
Impact evaluation of an adjustable speed drive installed at Ball-InCon Glass Packaging Corporation under the Energy $avings Plan
Impact evaluation of an Energy $avings Plan project at Holnam Incorporated
Technical Report
·
Fri Dec 31 23:00:00 EST 1993
·
OSTI ID:10132469
Impact evaluation of an adjustable speed drive installed at Ball-InCon Glass Packaging Corporation under the Energy $avings Plan
Technical Report
·
Sat May 01 00:00:00 EDT 1993
·
OSTI ID:10165593
Impact evaluation of an Energy $avings Plan project at Holnam Incorporated
Technical Report
·
Sat May 01 00:00:00 EDT 1993
·
OSTI ID:10163285