Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

A tau -- charm -- factory at Argonne. Preliminary assessment of the physics case and the Argonne Site

Technical Report ·
DOI:https://doi.org/10.2172/10130282· OSTI ID:10130282
Depending on the beam energy setting, the {tau} -- charm -- factory will be optimized to study physics with {tau} leptons, with charmed mesons, or with charmonium states. This report gives a short overview of the physics of these topics. Also discussed are the detectors and the costs associated with this project.
Research Organization:
Argonne National Lab., IL (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
W-31109-ENG-38
OSTI ID:
10130282
Report Number(s):
ANL-HEP-TR--94-12; ON: DE94007656
Country of Publication:
United States
Language:
English