Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Measurement-While-Drilling (MWD) development for air drilling

Conference ·
OSTI ID:10128272
When downhole contact between the BHA and formation was optimum, as it was during rotation, high signal levels were experienced. Survey data acquired at the connections, when the BHA was totally at rest, is excellent. GEC intends modifying the system to optimize operations consistent with these disparate factors. A Mean-Time-To-Failure (MTTF) of 89.9 hours appears reasonable from the data. It is not possible to infer an MTBF figure from this test. It is quite obvious, however, that the system reliability performance has been significantly improved since FT {number_sign}5 was performed almost two years earlier. Based on the above results, GEC concludes that it is certainly feasible to attain 100 hours MTBF, for the Model 27, in any and all situations, and hence to provide a reliable MWD for air-drilling.
Research Organization:
Geoscience Electronics Corp., Westlake Village, CA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC21-88MC25105
OSTI ID:
10128272
Report Number(s):
DOE/MC/25105--94/C0302; CONF-931156--35; ON: DE94007311; BR: AB0505050/AB0520000
Country of Publication:
United States
Language:
English

Similar Records

Measurement-while-drilling (MWD) development for air drilling
Conference · Fri May 01 04:00:00 UTC 1992 · OSTI ID:138835

Measurement-while-drilling (MWD) development for air drilling
Conference · Mon Jun 01 04:00:00 UTC 1992 · OSTI ID:10149522

Measurement-while-drilling (MWD) development for air drilling
Conference · Wed Jan 01 04:00:00 UTC 1992 · OSTI ID:5253866