Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Causes of damage to tube 1794-C

Technical Report ·
DOI:https://doi.org/10.2172/10122301· OSTI ID:10122301
Tube 1794-C was removed from the pile as a leaker on July 15, 1954. The tube had been in-pile since startup and had contained a charge of 32 ``C`` metal slugs just prior to discharge. The tube was slit and examined at the 105-DR underwater viewing facility by Pile Coolant Studies tube examination personnel. A report is made of the examination of tube 1794-C which revealed areas of severe pitting damage. This damage was apparently caused by cocked slugs abrading the tube. The attack was great enough to cause perforation of the tube at about 27 feet from the rear Van Stone flange. Examination of the slugs showed that a considerable number had been cocked. Evidence of severe tube scarring and rib grooves was found on the slugs. Strikingly similar examples of pitting and grooving were observed on flow laboratory minitubes and slugs exposed in high velocity water. It is concluded that the damage observed both in- and ex- pile was caused by the chattering of misaligned low density slugs in a high velocity stream. If the number of in-pile occurrences of this attack becomes excessive it is recommended that the water flow rate in tubes containing ``C`` metal slugs be maintained as low as is practical and consistent with corrosion limitations.
Research Organization:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
10122301
Report Number(s):
HW--32800; ON: DE93006709
Country of Publication:
United States
Language:
English

Similar Records

Investigation of slug chattering in ''C'' metal columns
Technical Report · Sun Mar 13 23:00:00 EST 1955 · OSTI ID:6331755

100 Areas technical activities report: Engineering, June 1947
Technical Report · Wed Jun 25 00:00:00 EDT 1947 · OSTI ID:10180096

Severe Pitting Attack of Pile Process Tubes and Slugs
Technical Report · Tue Jun 30 00:00:00 EDT 1953 · OSTI ID:2377955