The Fast Flux Test Facility shutdown program plan

Conference ·
OSTI ID:10118853
The Fast Flux Test Facility (FFTF) is a 400 MWt sodium-cooled research reactor owned by the US Department of Energy (DOE) and operated by the Westinghouse Hanford Company (WHC) on the Hanford Site in southeastern Washington State. The decision was made by the DOE in December, 1993, to initiate shutdown of the FFTF. This paper describes the FFTF Transition Project Plan (1) (formerly the FFTF Shutdown Program Plan) which provides the strategy, major elements, and project baseline for transitioning the FFTF to an industrially and radiologically safe shutdown condition. The Plan, and its resource loaded schedule, indicate this transition can be achieved in a period of six to seven years at a cost of approximately $359 million. The transition activities include reactor defueling, fuel offload to dry cask storage, sodium drain and reaction, management of sodium residuals, shutdown of auxiliary systems, and preparation of appropriate environmental and regulatory documentation. Completion of these activities will involve resolution of many challenging and unique issues associated with shutdown of a large sodium reactor facility. At the conclusion of these activities, the FFTF will be in a safe condition for turnover to the Hanford Site Environmental Restoration Contractor for a long term surveillance and maintenance phase and decommissioning.
Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
10118853
Report Number(s):
WHC-SA--2621; CONF-950216--37; ON: DE95006799; BR: 35AF11201/35AF11202
Country of Publication:
United States
Language:
English