General Electric Company Hanford Works, Project C-431-A Production Facility-Section A, design report
The 100-C project is to be located adjacent to the present 100-B Area. It is planned to build an addition to the present 181-B river pump house using the same elevations for pump settings, intakes, and floors as for the present pump house, thus maintaining the same suction conditions and flood protection as B Area. The 105 Building will be located on higher ground than B Area and therefore, protection against possible flood damage is assured. This report is divided into the following sections: (1) general description of project; (2) addition to existing river pump house; (3) raw water lines from 181-B addition to 183-C lead house; (4) the 183-C filter plant; (5) 190-C process pump house; (6) power house addition; (7) high tanks; (8) retention basins; (9) outside streamlines; (10) primary substation; (11) outside underground lines; (12) outside electric lines; (13) roads, railroads, walks, fences; (14) structural design of all buildings; and (15) architectural design of all buildings.
- Research Organization:
- Hanford Site (HNF), Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-76RL01830
- OSTI ID:
- 10118295
- Report Number(s):
- HDC-2101; ON: DE95006926; TRN: AHC29508%%208
- Resource Relation:
- Other Information: DN: Declassified; PBD: 29 Mar 1951
- Country of Publication:
- United States
- Language:
- English
Similar Records
Increased pumping capacity at 181-C scope and justification
Design criteria fire and sanitary water modifications
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
HANFORD PRODUCTION REACTORS
DESIGN
FEEDWATER
SITE SELECTION
PUMPS
REACTOR COOLING SYSTEMS
MODIFICATIONS
WATER SUPPLY
HISTORICAL ASPECTS
POWER SYSTEMS
STEAM SYSTEMS
220600
210300
RESEARCH
TEST
TRAINING
PRODUCTION
IRRADIATION
MATERIALS TESTING REACTORS
POWER REACTORS
NONBREEDING
GRAPHITE MODERATED