Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Proposed ground-water monitoring plans for the New Hope Pond and for four disposal sites on Chestnut Ridge

Technical Report ·
OSTI ID:10115918
In January 1985, Geraghty & Miller, Inc., (G&M) was retained by Martin Marietta Energy Systems, Inc., (Energy Systems) to evaluate the ground-water monitoring needs at five waste-disposal or storage sites at the Y-12 Plant in Oak Ridge, Tennessee. The sites are the proposed Temporary Low-Level Waste Disposal (TLLWD) site, the United Nuclear Company (UNC) Site, the Security Pit, the Sediment Disposal Basin, and the New Hope Pond. As shown in Figure 1, the sites are located along the crest of Chestnut Ridge, with the exception of New Hope Pond, a part of East Fork Poplar Creek at the north base of Chestnut Ridge. All directions stated in this report are with reference to the Y-12 Plant grid. Hydrogeologic and water quality results are presented.
Research Organization:
Oak Ridge Y-12 Plant, TN (United States); Geraghty and Miller, Inc., Oak Ridge, TN (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC05-84OS21400
OSTI ID:
10115918
Report Number(s):
Y/SUB--85-00206C/2; ON: DE93004760
Country of Publication:
United States
Language:
English