Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Polk power station syngas cooling system

Conference ·
OSTI ID:10115197
Tampa Electric Company (TEC) is in the site development and construction phase of the new Polk Power Station Unit No. 1. This will be the first unit at a new site and will use Integrated Gasification Combined Cycle (IGCC) Technology. The unit will utilize Texaco`s oxygen-blown, entrained-flow coal gasification, along with combined cycle power generation, to produce nominal 260MW. Integral to the gasification process is the syngas cooling system. The design, integration, fabrication, transportation, and erection of this equipment have provided and continue to provide major challenges for this project.
Research Organization:
Tampa Electric Co., FL (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
FC21-91MC27363
OSTI ID:
10115197
Report Number(s):
DOE/MC/27363--95/C0406; CONF-9410284--; ON: DE95005015
Country of Publication:
United States
Language:
English