Test plan for slow speed core sampling envelope test
This plan describes the testing parameters used to establish an operating envelope for slow rotation core sampling without purge gas for cooling.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 10114259
- Report Number(s):
- WHC-SD-WM-TP--266; ON: DE95003944; BR: 35AF11201/35AF11202
- Country of Publication:
- United States
- Language:
- English
Similar Records
Testing to expand the rotary mode core sampling system operating envelope
Test plan for core sampling drill bit temperature monitor
Report on Testing to Expand the Rotary Mode Core Sampling Operating Envelope
Technical Report
·
Tue Jan 20 23:00:00 EST 1998
·
OSTI ID:362398
Test plan for core sampling drill bit temperature monitor
Technical Report
·
Wed Oct 05 00:00:00 EDT 1994
·
OSTI ID:10191533
Report on Testing to Expand the Rotary Mode Core Sampling Operating Envelope
Technical Report
·
Sun Dec 12 23:00:00 EST 1999
·
OSTI ID:798805
Related Subjects
052002
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES
COVER GAS
DATA ACQUISITION
DRILL CORES
DRILLING
DRILLING EQUIPMENT
HANFORD RESERVATION
PLANNING
QUALITY ASSURANCE
QUALITY CONTROL
RADIOACTIVE WASTE STORAGE
RADIOACTIVE WASTES
SAFETY
SAMPLING
TANKS
TEMPERATURE MEASUREMENT
TESTING
UNDERGROUND STORAGE
WASTE DISPOSAL AND STORAGE
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES
COVER GAS
DATA ACQUISITION
DRILL CORES
DRILLING
DRILLING EQUIPMENT
HANFORD RESERVATION
PLANNING
QUALITY ASSURANCE
QUALITY CONTROL
RADIOACTIVE WASTE STORAGE
RADIOACTIVE WASTES
SAFETY
SAMPLING
TANKS
TEMPERATURE MEASUREMENT
TESTING
UNDERGROUND STORAGE
WASTE DISPOSAL AND STORAGE