Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Estimation and characterization of decontamination and decommissioning solid waste expected from the Plutonium Finishing Plant

Technical Report ·
DOI:https://doi.org/10.2172/10110150· OSTI ID:10110150
Purpose of the study was to estimate the amounts of equipment and other materials that are candidates for removal and subsequent processing in a solid waste facility when the Hanford Plutonium Finishing Plant is decontaminated and decommissioned. (Building structure and soil are not covered.) Results indicate that {approximately}5,500 m{sup 3} of solid waste is expected to result from the decontamination and decommissioning of the Pu Finishing Plant. The breakdown of the volumes and percentages of waste by category is 1% dangerous solid waste, 71% low-level waste, 21% transuranic waste, 7% transuranic mixed waste.
Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
10110150
Report Number(s):
WHC-EP--0829; ON: DE95005056; BR: 35AF11201/35AF11202
Country of Publication:
United States
Language:
English