Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Stormwater management at the ARID INEL

Conference ·
OSTI ID:10110028
NPDES stormwater permits are required for stormwater discharges to waters of the US (WUS). The Idaho National Engineering Laboratory (INEL) applied for coverage under a general NPDES stormwater permit because there is some potential for stormwater discharge to the Big Lost River System, which could infiltrate to groundwater. The main requirements of the permit are to prevent contaminants from coming into contact with stormwater and prevent contaminated stormwater from running off of facilities into WUS or groundwater. All INEL major facility areas have prepared and implemented stormwater pollution prevention plans (SWPPPs). The INEL also applied for coverage under a separate NPDES general permit for stormwater discharges from construction sites. An INEL Generic SWPPP for construction activities was prepared and implemented for all construction projects at the INEL.
Research Organization:
EG and G Idaho, Inc., Idaho Falls, ID (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC07-76ID01570
OSTI ID:
10110028
Report Number(s):
EGG-M--94112; CONF-9405126--4; ON: DE95005030
Country of Publication:
United States
Language:
English