Special requirements CG-791 tie-in B, D, DR, and F reactors
This memorandum discusses coupling of the reactor exhaust system to the filter building, under Project CG-791, which will require diversion of the 105 Building exhaust air to two temporary stacks. The temporary stacks will be installed over each of two exhaust fans. The use of these temporary (short) stacks during the tie-in period (estimated at 8 to 16 days) could greatly aggravate radiological problems because of reduced dilution and of the reactor building exhaust air. Special operating requirements are given.
- Research Organization:
- General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-76RL01830
- OSTI ID:
- 10108374
- Report Number(s):
- HW--65625; ON: DE93003944
- Country of Publication:
- United States
- Language:
- English
Similar Records
Production test SB-221-B-PA-3: Operation of B Plant using one ventilating stack fan (291 Building)
Flow test: CG-482 ``DR type`` rear pigtail with B, D, DR and F pile fittings
Qualification of Mixing Criteria by Computational Fluid Dynamics Modeling for the 325 Building Stack Revision
Technical Report
·
Mon Nov 26 23:00:00 EST 1945
·
OSTI ID:7271865
Flow test: CG-482 ``DR type`` rear pigtail with B, D, DR and F pile fittings
Technical Report
·
Fri May 25 00:00:00 EDT 1956
·
OSTI ID:10179343
Qualification of Mixing Criteria by Computational Fluid Dynamics Modeling for the 325 Building Stack Revision
Technical Report
·
Wed May 01 00:00:00 EDT 2024
·
OSTI ID:2368592