Improved coolant backup 100-B, D, F, DR, H and C areas design study
Preliminary engineering studies have indicated the need for modifications and improvements to the reactor coolant backup systems of the old areas in order to provide adequate safety of operation at power levels programmed for the future. These evaluations of the coolant backup systems were based on the recently adopted reactor cooling safety criteria. It was concluded that the secondary coolant systems would be adequate in capacity and reliability for the proposed future operating conditions except for certain cases of natural disaster such as earthquake damage. It was concluded that the last ditch coolant systems would be inadequate for the proposed future reactor operating conditions. The purpose of this report is to define the scope of modifications and improvements required to provide adequate last ditch systems in the old areas for future operating conditions as proposed by the Reactor Modification Program. Irradiation Processing Department, Fiscal Years 1961 through 1966. Adequate last ditch cooling will be provided for the 100-K Areas under Project CGI-844 which is currently in progress. The results of this study provide a basis for future budgeting action and project planning.
- Research Organization:
- General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-76RL01830
- OSTI ID:
- 10108362
- Report Number(s):
- HW--67030; ON: DE93003948
- Country of Publication:
- United States
- Language:
- English
Similar Records
Coolant backup design study basis and objective
Preliminary design basis modifications for improved coolant backup 100-B, D, F, H, DR, and C areas
Owner-operator process and functional requirements interim modifications for improved coolant backup 100-B, C, D, DR, F, and H Reactors, Project CGI-905. Revision 1
Technical Report
·
Wed Aug 31 00:00:00 EDT 1960
·
OSTI ID:10147310
Preliminary design basis modifications for improved coolant backup 100-B, D, F, H, DR, and C areas
Technical Report
·
Fri Aug 12 00:00:00 EDT 1960
·
OSTI ID:10145627
Owner-operator process and functional requirements interim modifications for improved coolant backup 100-B, C, D, DR, F, and H Reactors, Project CGI-905. Revision 1
Technical Report
·
Mon Oct 23 00:00:00 EDT 1961
·
OSTI ID:10175111