Hot gas cleanup test facility for gasification and pressurized combustion. Quarterly technical progress report, January 1--March 31, 1992
This quarterly technical progress report summarizes work completed during the Sixth Quarter of the First Budget Period, January 1 through March 31, 1992, under the Department of Energy (DOE) Cooperative Agreement No. DE-FC21-90MC25140 entitled ``Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion.`` The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. The major emphasis during this reporting period was expanding the test facility to address system integration issues of hot particulate removal in advanced power generation systems. The conceptual design of the facility was extended to include additional modules for the expansion of the test facility, which is referred to as the Power Systems Development Facility (PSOF). A letter agreement was negotiated between Southern Company Services (SCS) and Foster Wheeler (FW) for the conceptual design of the Advanced Pressurized Fluid-Bed Combustion (APFBC)/Topping Combustor/Gas Turbine System to be added to the facility. The expanded conceptual design also included modifications to the existing conceptual design for the Hot Gas Cleanup Test Facility (HGCTF), facility layout and balance of plant design for the PSOF. Southern Research Institute (SRI) began investigating the sampling requirements for the expanded facility and assisted SCS in contacting Particulate Control Device (PCD) vendors for additional information. SCS also contacted the Electric Power Research Institute (EPRI) and two molten carbonate fuel cell vendors for input on the fuel cell module for the PSDF.
- Research Organization:
- Southern Co. Services, Inc., Birmingham, AL (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- FC21-90MC25140
- OSTI ID:
- 10108181
- Report Number(s):
- DOE/MC/25140-3159; ON: DE93004820
- Resource Relation:
- Other Information: PBD: [1992]
- Country of Publication:
- United States
- Language:
- English
Similar Records
Turbine and hot gas cleanup at Wilsonville
Power systems development facility. Quarterly technical progress report, July 1--September 30, 1993
Related Subjects
FUEL GAS
HOT GAS CLEANUP
COMBUSTION PRODUCTS
TEST FACILITIES
PARTICULATES
REMOVAL
PROGRESS REPORT
NUMERICAL DATA
COAL GASIFICATION
COAL
FLUIDIZED-BED COMBUSTION
PRESSURIZATION
EFFICIENCY
PARTICLE SIZE
TOPPING CYCLES
GAS TURBINES
010402
010404
014000
PURIFICATION AND UPGRADING
GASIFICATION
COMBUSTION