DUMAND-II progress report
The design, scientific goals, and capabilities of the DUMAND II detector system are described. Construction was authorized by DOE in 1990, and development of various detector subsystems is under way. Current plans include deployment of the shore cable, junction box and three strings of optical detector modules in 1992, with expansion to the full 9-string configuration about one year later.
- Research Organization:
- Washington Univ., Seattle, WA (United States). Visual Techniques Lab.
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- FG06-91ER40614
- OSTI ID:
- 10107892
- Report Number(s):
- CONF-9105106--35; UWSEA-PUB--91-09; ON: DE92004380
- Country of Publication:
- United States
- Language:
- English
Similar Records
DUMAND-II progress report
DUMAND-II progress report
DUMAND II status report
Conference
·
Mon Dec 31 23:00:00 EST 1990
·
OSTI ID:6099944
DUMAND-II progress report
Conference
·
Tue Jun 15 00:00:00 EDT 1993
· AIP Conference Proceedings (American Institute of Physics); (United States)
·
OSTI ID:6394362
DUMAND II status report
Conference
·
Thu Apr 04 23:00:00 EST 1991
· AIP Conference Proceedings (American Institute of Physics); (United States)
·
OSTI ID:5551047