Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Technical Support Section annual work plan for FY 1995

Technical Report ·
DOI:https://doi.org/10.2172/10107796· OSTI ID:10107796

The Technical Support Section (TSS) of the Instrumentation and Controls (I and C) Division of Oak Ridge National Laboratory (ORNL) provides technical services such as fabrication, modification, installation, calibration, operation, repair, and preventive maintenance of instruments and other related equipment. Work performed by TSS is in support of basic and applied research and development (R and D), engineering, and instrument and computer systems managed by ORNL. Because the activities and priorities of TSS must be adapted to the technical support needs of ORNL, the TSS Annual Work Plan is derived from and driven directly by current trends in the budgets and activities of each ORNL division for which TSS provides support. Trends that will affect TSS planning during this period are reductions in the staffing levels of some R and D programs because of attrition or budget cuts and the establishment of new facilities or environmental safety and health programs. The ``Long-Range Work Plan`` is based on estimates of impact of the long-range priorities and directions of the Laboratory. Identifiable proposed new facilities and programs provide additional basis for long-range planning. After identifying long-range initiatives, TSS planning includes future training requirements, reevaluation of qualifications for new-hires, and identification of essential test equipment needed in new work.

Research Organization:
Oak Ridge National Lab., TN (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC05-84OR21400
OSTI ID:
10107796
Report Number(s):
ORNL/TM--12868; ON: DE95004738
Country of Publication:
United States
Language:
English

Similar Records

Technical Support Section annual work plan for FY 1998
Technical Report · Sun Nov 30 23:00:00 EST 1997 · OSTI ID:631261

Technical Support Section annual work plan for FY 1997
Technical Report · Tue Oct 01 00:00:00 EDT 1996 · OSTI ID:415969

Technical support section annual work plan for FY 1996
Technical Report · Sun Mar 31 23:00:00 EST 1996 · OSTI ID:231199