PEP 2: SLAC-based Asymmetric B Factory
Conference
·
OSTI ID:10107480
The proposal for upgrading the existing PEP collider at SLAC to enable the copious production of boosted B mesons is the result of several years of collaborative study by groups representing LBL, LLNL and SLAC. The PEP II design has evolved in a considered fashion from its initial conceptualization to a very advanced level of understanding, well-substantiated by R&D results on the key design issues. We describe the proposed upgrade, review the early conceptual decisions, outline the significant remaining questions, and briefly describe current results from the ongoing R&D effort which have shown these questions to be tractable and the initial concepts to be sound.
- Research Organization:
- Stanford Linear Accelerator Center, Menlo Park, CA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC03-76SF00515
- OSTI ID:
- 10107480
- Report Number(s):
- SLAC-PUB--5936; CONF-920837--13; ON: DE93004012
- Country of Publication:
- United States
- Language:
- English
Similar Records
PEP II: SLAC-based asymmetric B factory
PEP 2: SLAC-based Asymmetric B Factory
PEP-2 asymmetric B factory: R&D results
Conference
·
Tue Feb 04 23:00:00 EST 1992
· AIP Conference Proceedings (American Institute of Physics); (United States)
·
OSTI ID:5110410
PEP 2: SLAC-based Asymmetric B Factory
Conference
·
Tue Sep 01 00:00:00 EDT 1992
·
OSTI ID:6855322
PEP-2 asymmetric B factory: R&D results
Conference
·
Sat Feb 29 23:00:00 EST 1992
·
OSTI ID:10148538