Tennessee Valley Authority Eagle Bend 161-kV delivery point environmental assessment

Technical Report ·
DOI:https://doi.org/10.2172/10105296· OSTI ID:10105296
Eagle Bend is an area located in a bend of the Clinch River about one mile southeast of Clinton, Tennessee, in Anderson County. This area, including an industrial park, is supplied electric power by the Clinton Utilities Board (UB) through its 69-kV system, which is in turn supplied by TVA over a 69-kV transmission line from Norris Hydro Plant. Studies of the power supply in the area indicate that there will likely be significant load growth both in the Clinton area in general and the industrial park in particular. Studies further show that if this new load is supplied at 69-kV, the TVA transformer at Norris Hydro which supplies this load will be overloaded by the summer of 1993 and no feasible alternate source which would maintain the quality and reliability of the power delivered to the Clinton system exists to accept this load. Clinton UB also needs to transfer load from its Clinton substation in the same time period to prevent overloading. Additional studies and consultation between TVA and Clinton UB have indicated that the best solution to this problem is to supply this load at 161-kV at a new delivery point for Clinton UB. This would require the construction of a new 161/13-kV substation by Clinton UB and the construction by TVA of a new 161-kV transmission line to connect this substation to the existing TVA 161-kV transmission system.
Research Organization:
Tennessee Valley Authority, Knoxville, TN (United States)
Sponsoring Organization:
Tennessee Valley Authority, Knoxville, TN (United States)
OSTI ID:
10105296
Report Number(s):
TVA/RG/EQS--93/1; ON: DE95003302
Country of Publication:
United States
Language:
English