Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

First operation of ATLAS using the PII linac and a comparison to tandem injection

Conference ·
OSTI ID:10104947
The ATLAS Positive Ion Injector (PII) is designed to replace the tandem injector for the ATLAS heavy-ion facility. When the PII project is complete, ATLAS will be able to accelerate all ions through uranium to energies above the Coulomb barrier. PII consists of an ECR ion source on a 350 kV platform and a very low-velocity superconducting linac. The PII project is nearing completion. First beam from the complete system is expected in early 1992. Beam tests and experiments using a partially completed PII linac have demonstrated that the technical design goals are being met. The results of the early beam tests and first experiments will be discussed and compared to the performance of ATLAS with tandem injection. 10 refs., 2 figs.
Research Organization:
Argonne National Lab., IL (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
W-31109-ENG-38
OSTI ID:
10104947
Report Number(s):
ANL/CP--74843; CONF-9110258--4; ON: DE92004724
Country of Publication:
United States
Language:
English

Similar Records

First operation of ATLAS using the PII linac and a comparison to tandem injection
Conference · Mon Dec 31 23:00:00 EST 1990 · OSTI ID:6004978

Status of the uranium upgrade of ATLAS
Conference · Mon Dec 31 23:00:00 EST 1990 · OSTI ID:5843174

Operational status of the uranium beam upgrade of the ATLAS accelerator
Conference · Sun Aug 01 00:00:00 EDT 1993 · OSTI ID:10179893