Fermilab Tevatron and upgrade status
Conference
·
OSTI ID:10103258
Performance and performance limitations of the Tevatron proton-antiproton collider at Fermilab will be discussed along with plans for improving the performance by a factor of five by the end of the decade. The centerpiece of this effort is the Fermilab Main Injector, a new 150 GeV synchrotron now under construction. Status of the project will be presented.
- Research Organization:
- Fermi National Accelerator Lab., Batavia, IL (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC02-76CH03000
- OSTI ID:
- 10103258
- Report Number(s):
- FNAL/C--94/360; CONF-9410258--1; ON: DE95003501
- Country of Publication:
- United States
- Language:
- English
Similar Records
Prospects of TEVATRON upgrade
Initial operation of the Tevatron collider
Performance of the Fermilab Main Ring during the 1988-89 Tevatron collider operation
Conference
·
Wed Aug 31 00:00:00 EDT 1988
·
OSTI ID:6747251
Initial operation of the Tevatron collider
Conference
·
Sat Feb 28 23:00:00 EST 1987
·
OSTI ID:6415944
Performance of the Fermilab Main Ring during the 1988-89 Tevatron collider operation
Conference
·
Tue Feb 28 23:00:00 EST 1989
·
OSTI ID:6178155