Decommissioning the UHTREX Reactor Facility at Los Alamos, New Mexico
The Ultra-High Temperature Reactor Experiment (UHTREX) facility was constructed in the late 1960s to advance high-temperature and gas-cooled reactor technology. The 3-MW reactor was graphite moderated and helium cooled and used 93% enriched uranium as its fuel. The reactor was run for approximately one year and was shut down in February 1970. The decommissioning of the facility involved removing the reactor and its associated components. This document details planning for the decommissioning operations which included characterizing the facility, estimating the costs of decommissioning, preparing environmental documentation, establishing a system to track costs and work progress, and preplanning to correct health and safety concerns in the facility. Work to decommission the facility began in 1988 and was completed in September 1990 at a cost of $2.9 million. The facility was released to Department of Energy for other uses in its Los Alamos program.
- Research Organization:
- Los Alamos National Lab., NM (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- W-7405-ENG-36
- OSTI ID:
- 10102612
- Report Number(s):
- LA--12356; ON: DE93002708
- Country of Publication:
- United States
- Language:
- English
Similar Records
Decommissioning three nuclear reactors at Los Alamos National Laboratory
Decommissioning the Los Alamos Molten Plutonium Reactor Experiment (LAMPRE I)
Related Subjects
220600
220900
54 ENVIRONMENTAL SCIENCES
540230
COST
DECONTAMINATION
ENVIRONMENTAL EFFECTS
HISTORICAL ASPECTS
OCCUPATIONAL EXPOSURE
PLANNING
PROGRAM MANAGEMENT
RADIATION MONITORING
RADIOACTIVE MATERIALS MONITORING AND TRANSPORT
RADIOACTIVE WASTE DISPOSAL
RADIOACTIVE WASTES
REACTOR COMPONENTS
REACTOR DECOMMISSIONING
REACTOR SAFETY
RESEARCH
TEST
TRAINING
PRODUCTION
IRRADIATION
MATERIALS TESTING REACTORS
SCHEDULES
SOILS
UHTREX REACTOR