Dynamometer Testing of Samsung 2.5MW Drivetrain: Cooperative Research and Development Final Report, CRADA Number CRD-08-311
SHI's prototype 2.5 MW wind turbine drivetrain was tested at the NWTC 2.5 MW dynamometer test facility over the course of 4 months between December 2009 and March 2010. This successful testing campaign allowed SHI to validate performance, safety, control tuning, and reliability in a controlled environment before moving to full-scale testing and subsequent introduction of a commercial product intothe American market.
- Research Organization:
- National Renewable Energy Laboratory (NREL), Golden, CO (United States)
- Sponsoring Organization:
- USDOE Office of Energy Efficiency and Renewable Energy (EERE)
- DOE Contract Number:
- AC36-08GO28308
- OSTI ID:
- 1008194
- Report Number(s):
- NREL/TP-7A1-49258
- Country of Publication:
- United States
- Language:
- English
Similar Records
NWTC Dynamometer and Controllable Grid Interface Commissioning and Testing of General Electric Wind Turbine Drivetrain: Cooperative Research and Development Final Report, CRADA Number CRD 14-551
NREL and Clemson University Drivetrain Test Facility Collaboration: Cooperative Research and Development Final Report, CRADA Number CRD-13-509
Economic and Performance Analysis of Gear Box Failures. Cooperative Research and Development Final Report, CRADA Number CRD-07-236
Technical Report
·
Tue Jul 03 00:00:00 EDT 2018
·
OSTI ID:1462941
NREL and Clemson University Drivetrain Test Facility Collaboration: Cooperative Research and Development Final Report, CRADA Number CRD-13-509
Technical Report
·
Tue Jul 03 00:00:00 EDT 2018
·
OSTI ID:1462942
Economic and Performance Analysis of Gear Box Failures. Cooperative Research and Development Final Report, CRADA Number CRD-07-236
Technical Report
·
Thu Oct 01 00:00:00 EDT 2015
·
OSTI ID:1225966