Physics Division Semiannual Progress Report for Period Ending September 10, 1954

Technical Report ·
DOI:https://doi.org/10.2172/1006211· OSTI ID:1006211
 [1]
  1. Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)
Since the contribution of the scattered flux to the total measured flux in experiments at the Tower Shielding Facility must be known for a variety of conditions, much of the work of the Shielding Analysis Group has been directed toward calculations of neutron ground and air scattering. These calculations are being compared with similar calculations at other installations. In addition, a calculation of the fast-neutron leakage from the Bulk Shielding Reactor was performed, and agreement with leakage flux measurements made with the recoil proton spectrometer indicates that the reactor power density determinations are correct. A calculation by the Monte Carlo method of the number and energy of slant incident photons that penetrate or are reflected from a finite thick slab of infinite extent was also made.
Research Organization:
Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)
Sponsoring Organization:
US Atomic Energy Commission (AEC)
DOE Contract Number:
W-7405-ENG-26
OSTI ID:
1006211
Report Number(s):
ORNL--1820
Country of Publication:
United States
Language:
English

Similar Records

AFWL-ATAC joint shielding program. Parametric investigation of the exponential transformation. Final report, 1 October 1964-30 September 1965
Technical Report · Fri Dec 31 23:00:00 EST 1965 · OSTI ID:5317713

REACTOR SHIELDING INFORMATION MEETING SCHENECTADY, MAY 13 AND 14, 1954
Technical Report · Thu Oct 30 23:00:00 EST 1958 · OSTI ID:4301701

NEUTRON PHYSICS DIVISION ANNUAL PROGRESS REPORT. Period Ending September 1, 1962
Technical Report · Thu Jan 10 19:00:00 EST 1963 · OSTI ID:4766580