skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Superconducting magnet needs for the ILC

Conference ·
OSTI ID:917853

The ILC Reference Design Report was completed early in February 2007. The Magnet Systems Group was formed to translate magnetic field requirements into magnet designs and cost estimates for the Reference Design. As presently configured, the ILC will have more than 13,000 magnetic elements of which more than 2300 will be based on superconducting technology. This paper will describe the major superconducting magnet needs for the ILC as presently determined by the Area Systems Groups, responsible for beam line design, working with the Magnet Systems Group. The superconducting magnet components include Main Linac quadrupoles, Positron Source undulators, Damping Ring wigglers, a complex array of Final Focus superconducting elements in the Beam Delivery System, and large superconducting solenoids in the e{sup +} and e{sup -} Sources, and the Ring to Main Linac lines.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-07CH11359
OSTI ID:
917853
Report Number(s):
FERMILAB-CONF-07-237-TD; TRN: US0805156
Resource Relation:
Conference: Presented at Particle Accelerator Conference (PAC 07), Albuquerque, New Mexico, 25-29 Jun 2007
Country of Publication:
United States
Language:
English

Similar Records

SUPERCONDUCTING MAGNET NEEDS FOR THE ILC.
Conference · Mon Jun 25 00:00:00 EDT 2007 · OSTI ID:917853

THE SUPERCONDUCTION MAGNETS OF THE ILC BEAM DELIVERY SYSTEM.
Conference · Mon Jun 25 00:00:00 EDT 2007 · OSTI ID:917853

ILC cryogenic systems reference design
Journal Article · Tue Jan 01 00:00:00 EST 2008 · AIP Conf.Proc.985:1565-1572,2008 · OSTI ID:917853