IR Up Grade Plans for the PEP-II B-Factory
PEP-II, the SLAC, LBNL, LLNL B-factory has achieved a peak luminosity of over 9 x 10{sup 33} cm{sup -2}s{sup -1}, more than 3 times the design luminosity, and plans to obtain a luminosity of over 1 x 10{sup 34} cm{sup -2} sec{sup -1} in the next year. In order to push the luminosity performance of PEP-II to even higher levels an upgrade to the interaction region (IR) is being designed. In the present design, the interaction point (IP) is a head-on collision with two strong horizontal dipole magnets located between 21-70 cm from the IP that bring the beams together and separate the beams after the collision. The first parasitic crossing (PC) is 63 cm from the IP in the present by2 bunch spacing. Future improvements to PEP-II performance include lowering the {beta}*{sub y} values of both rings. This will increase the {beta}{sub y} value at the PCs which increases the beam-beam effect at these non-colliding crossings. Introducing a horizontal crossing angle at the IP quickly increases the beam separation at the PCs but recent beam-beam studies indicate that a significant luminosity reduction occurs when a crossing angle is introduced at the IP. We discuss these issues and describe the present interaction region upgrade design.
- Research Organization:
- SLAC National Accelerator Lab., Menlo Park, CA (United States)
- Sponsoring Organization:
- USDOE Office of Science (US)
- DOE Contract Number:
- AC03-76SF00515
- OSTI ID:
- 827330
- Report Number(s):
- SLAC-PUB-10546; TRN: US0403286
- Resource Relation:
- Other Information: PBD: 7 Jul 2004
- Country of Publication:
- United States
- Language:
- English
Similar Records
Results and Plans of the PEP-II B-Factory
Progress of the PEP-II-B-factory