skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: An 8-GeV Synchrotron-Based Proton Driver

Conference ·
OSTI ID:811462

In January 2002, the Fermilab Director initiated a design study for a high average power, modest energy proton facility. Such a facility is a possible candidate for a construction project in the U.S. starting in the middle of this decade. The key technical element is a new machine, dubbed the ''Proton Driver,'' as a replacement of the present Booster. The study of an 8-GeV synchrotron-based proton driver has been completed and published. This paper will give a summary report, including machine layout and performance, optics, beam dynamics issues, technical systems design, civil construction, cost estimate and schedule.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Energy Research (ER) (US)
DOE Contract Number:
AC02-76CH03000
OSTI ID:
811462
Report Number(s):
FERMILAB-Conf-03/141; TRN: US0303098
Resource Relation:
Conference: Particle Accelerator Conference, Portland, OR (US), 05/12/2003--05/16/2003; Other Information: PBD: 4 Jun 2003
Country of Publication:
United States
Language:
English

Similar Records

Proton driver
Conference · Tue Sep 12 00:00:00 EDT 2000 · OSTI ID:811462

2 MW upgrade of the Fermilab Main Injector
Conference · Wed Jun 04 00:00:00 EDT 2003 · OSTI ID:811462

RF parameter curves for a proton driver synchrotron
Conference · Thu Jul 12 00:00:00 EDT 2001 · OSTI ID:811462