skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Interim Stabilization Equipment Essential and Support Drawing Plan

Technical Report ·
DOI:https://doi.org/10.2172/805402· OSTI ID:805402

The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. [CHG 2000a]. Support Drawings are those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings. [CHG 2000a].

Research Organization:
CH2M Hill Hanford Group, Inc., Richland, WA (United States)
Sponsoring Organization:
USDOE Office of Environmental Management (EM) (US)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
805402
Report Number(s):
HNF-4184, Rev.9; TRN: US0301314
Resource Relation:
Other Information: PBD: 16 Oct 2000
Country of Publication:
United States
Language:
English

Similar Records

Interim Stabilization Equipment Essential and Support Drawing Plan
Technical Report · Fri Oct 22 00:00:00 EDT 1999 · OSTI ID:805402

Interim Stabilization Equipment Essential and Support Drawing Plan
Technical Report · Wed Nov 17 00:00:00 EST 1999 · OSTI ID:805402

Characterization equipment essential drawing plan
Technical Report · Fri May 14 00:00:00 EDT 1999 · OSTI ID:805402