Title: CEBAF Cryomodule Commissioning in the South Linac

Conference ·
OSTI ID:791942

When complete, the Continuous Electron Beam Accelerator Facility will house a 4 GeV recirculating linear accelerator containing 42 1/4 cryomodules arrayed in two antiparallel linacs and an injector. Currently, 38 1/4 cryomodules have been installed. Each cryomodule contains eight superconducting niobium 5-cell rf cavities that operate at 1.497 GHz [1]. A cryomodule must provide an energy gain of 20 MeV to the 200 mu-A beam [2]. The resultant dynamic heat load must be less than 45 W. The cavity parameters that are measured during the commissioning process include the external Q's (Q{sub ext}) of the cavity ports, the unloaded Q (Q{sub 0}) of the cavity as a function of accelerating gradient, and the maximum operating gradient of the cavity [3]. Finally, the mechanical tuners are cycled and characterized. A portable test stand allows local control of the rf system and provides automated data acquisition. During the period from April 1993 through September 1993, 16 of the 20 cryomodules installed in the South Linac were commissioned. All cryomodules tested in the South Linac meet or exceed the CEBAF specifications. This paper describes the results of the commissioning of the first 10 cryomodules in the South Linac.

Research Organization:
Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)
Sponsoring Organization:
USDOE Office of Energy Research (ER) (US)
DOE Contract Number:
AC05-84ER40150
OSTI ID:
791942
Report Number(s):
CEBAF-PR-93-066; DOE/ER/40150-2016; TRN: US200204%%212
Resource Relation:
Conference: 6th RF Superconductivity Workshop, Newport News, VA (US), 10/1993; Other Information: PBD: 1 Oct 1993