Title: DEVELOPMENT OF TECHNOLOGIES AND ANALYTICAL CAPABILITIES FOR VISION 21 ENERGY PLANTS

Technical Report ·
DOI:https://doi.org/10.2172/785120· OSTI ID:785120

The training of a new project team member was completed (Task 2.1). The Software Requirements Document was written (Task 2.3). It was determined that the CAPE-OPEN interfaces are sufficient for the communication between Fluent and V21 Controller (Task 2.4). The AspenPlus-Fluent prototype on allyl/triacetone alcohol production was further developed to assist the GUI and software design tasks. The prototype was also used to analyze the sensitivity of a process simulation result with respect to a parameter in a CFD model embedded in the process simulation. Thus the integration of process simulation and CFD provides additional process insights and enables the engineer to optimize overall process performance (e.g., product purity and yield) with respect to important CFD design and operation parameters (e.g., CSTR shaft speed). A top-level design of the V21 Controller was developed and discussed. A draft version of the Software Design Document was written (Task 2.5/2.6). A preliminary software development plan was outlined. At first the V21 Controller will be developed and tested in two parts--a part that communicates with Fluent and a part that communicates with Aspen Plus. Then the two parts will be combined and tested with the allyl/triacetone alcohol flow sheet simulation. Much progress was made in writing the code for the two parts (Task 2.7). A requirement for pre-configured models was identified and added to the software requirements document (Task 2.9). Alstom Power's INDVU code was ported to the PC platform and calibrated. Aspen Plus model of the RP&L unit was improved to reflect the latest information received on the unit. Thus the preparation for linking INDVU code with the Aspen Plus model of RP&L unit is complete (Task 2.14). A report describing Demo Case 1 was written and submitted to DOE for review and approval (Task 3.1). The first Advisory Board meeting was held at the Fluent Users Group Meeting on June 6th. At the Advisory Board meeting, the project was reviewed, a demonstration was made, and verbal feedback was received. Meeting minutes have been issued (Task 5.0). Global-CAPE-OPEN organization was contacted for obtaining draft specifications in CORBA that are needed for writing the interfaces between V21 Controller and Fluent. Efforts are underway to establish collaboration with Norsk Hydro, who is leading a Global CAPE-OPEN project on linking CFD and process simulation models. Because of the similarity between that project and the present project, the two project teams can learn much from each other (Task 7.0).

Research Organization:
National Energy Technology Laboratory (NETL), Pittsburgh, PA, Morgantown, WV, and Albany, OR (United States)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
FC26-00NT40954
OSTI ID:
785120
Report Number(s):
FC26-00NT40954-03; TRN: AH200131%%95
Resource Relation:
Other Information: PBD: 10 Jul 2001