Preliminary study of AC power feeders for AGS booster
It has been proposed that the AGS Heavy Ion/Proton Booster be excited directly from the electric power distribution system without intervening an energy storage buffer such as an MG set or a magnetic energy buffer. The average power requirement of the AGS Booster is less than many single-loads presently housed on the lab site. However, the power swing will be the largest single pulsating load on the lab site. The large power swings will impact on the power grid producing utility-line disturbances such as voltage fluctuations and harmonic generation. Thus, it is necessary to carefully evaluate the quality of the electric power system resulting from the interconnection, such that the utility system is not degraded either on the lab site or at LILCO's substation.
- Research Organization:
- Brookhaven National Lab. (BNL), Upton, NY (United States)
- Sponsoring Organization:
- USDOE; USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC02-76CH00016
- OSTI ID:
- 7289491
- Report Number(s):
- BNL-47799; AGS/AD-92-7; ON: DE92019253
- Country of Publication:
- United States
- Language:
- English
Similar Records
Spectrum analysis of the power line flicker induced by the electrical test of the prototype Booster dipole
Spectrum analysis of the power line flicker induced by the electrical test of the prototype Booster dipole