skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Experimental test of a new antiproton acceleration scheme in the Fermilab Main Injector

Conference ·
OSTI ID:15017200

In an effort to provide higher intensity and lower emittance antiproton beam to the Tevatron collider for high luminosity operation, a new Main Injector (MI) antiproton acceleration scheme has been developed [1-4]. In this scheme, beam is accelerated from 8 to 27 GeV using the 2.5 MHz rf system and from 27 to 150 GeV using the 53 MHz rf system. This paper reports the experimental results of beam study. Simulation results are reported in a different PAC'05 paper [5]. Experiments are conducted with proton beam from the Booster. Acceleration efficiency, emittance growth and beam harmonic transfer between 2.5 MHz (h=28) and 53 MHz (h=588) buckets have been studied. Beam study shows that one can achieve an overall acceleration efficiency of about 100%, longitudinal emittance growth less than 20% and negligible transverse emittance growth. accelerated to 150 GeV and injected to the Tevatron. The multi-bunch coalescing process is eliminated in this acceleration scheme. Consequently, longitudinal emittance growth is reduced. Smaller emittance growth reduces beam loss.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-76CH03000
OSTI ID:
15017200
Report Number(s):
FERMILAB-CONF-05-101-AD; TRN: US200612%%323
Resource Relation:
Conference: To appear in the proceedings of Particle Accelerator Conference (PAC 05), Knoxville, Tennessee, 16-20 May 2005
Country of Publication:
United States
Language:
English