skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: The Injection System of the INFN-SuperB Factory Project: Preliminary Design

Conference · · Conf.Proc.C100523:THPEA007,2010
OSTI ID:1045188

The ultra high luminosity B-factory (SuperB) project of INFN requires a high performance and reliable injection system, providing electrons at 4 GeV and positrons at 7 GeV, to fulfil the very tight requirements of the collider. Due to the short beam lifetime, continuous injection of electron and positron bunches in both LER and HER rings is necessary to maintain an high average luminosity. Polarized electrons are required for experiments and must be delivered by the injection system, due to the beam lifetime shorter than the ring polarization build-up: they will be produced by means of a SLAC-SLC polarized gun. The emittance and the energy spread of the e{sup -}/e{sup +} beams are reduced in a 1 GeV Damping Ring (DR) before injection in the main rings. Two schemes for positron production are under study, one with e{sup -}/e{sup +} conversion at low energy (< 1 Gev) and one with conversion at 6 GeV and a recirculation line to bring the positrons back to the DR. Acceleration through the Linac is provided by a 2856 MHz RF system made of travelling wave (TW), room temperature accelerating structures.

Research Organization:
SLAC National Accelerator Lab., Menlo Park, CA (United States)
Sponsoring Organization:
USDOE Office of Science (SC)
DOE Contract Number:
AC02-76SF00515
OSTI ID:
1045188
Report Number(s):
SLAC-PUB-15152; TRN: US1203539
Journal Information:
Conf.Proc.C100523:THPEA007,2010, Conference: 1st International Particle Accelerator Conference: IPAC'10, 23-28 May 2010, Kyoto, Japan
Country of Publication:
United States
Language:
English

Similar Records

Updated Design of the Italian SuperB Factory Injection System
Conference · Thu Apr 26 00:00:00 EDT 2012 · IPAC-2011-THPZ024, Sep 2011. 3pp. · OSTI ID:1045188

SuperB Progress Report for Accelerator
Technical Report · Tue Feb 14 00:00:00 EST 2012 · OSTI ID:1045188

The Super-B Project Accelerator Status
Conference · Wed Aug 17 00:00:00 EDT 2011 · Conf.Proc.C100523:tupeb003,2010 · OSTI ID:1045188