LIFAC Sorbent Injection Desulfurization Demonstration Project. Quarterly report No. 12, July--September 1993
In December 1989, the U.S. Department of Energy selected 13 projects for funding under the Federal Clean Coal Technology Program (Round III). One of the projects selected was the project sponsored by LIFAC North America, (LIFAC NA), titled {open_quotes}LIFAC Sorbent Injection Desulfurization Demonstration Project.{close_quotes} The LIFAC technology uses upper-furnace limestone injection with patented humidification of the flue gas to remove 75-85% of the sulfur dioxide (SO{sub 2}) in the flue gas. The host site for this $22 million, three-phase project is Richmond Power and Light`s Whitewater Valley Unit No. 2 in Richmond, Indiana. The three project phases are: (1) Design; (2A) Long Lead Procurement; (2B) Construction; and (3) Operations. The design phase began on August 8, 1990 and was scheduled to last six months. Phase 2A, long lead procurement, overlaps the design phase and was expected to require about four months to complete. The construction phase was then to continue for another seven months, while the operations phase was scheduled to last about twenty-six months. In November 1990, after a ten (10) month negotiation period, LIFAC NA and the U.S. DOE entered into a Cooperative Agreement for the design, construction, and demonstration of the LIFAC system. This report is the twelfth Technical Progress Report covering the period July 1, 1993 through the end of September 1993. Due to the power plant`s planned outage in March 1991, and the time needed for engineering, design and procurement of critical equipment, DOE and LIFAC NA agreed to execute the Design Phase of the project in August 1990, with DOE funding contingent upon final signing of the Cooperative Agreement.
- Research Organization:
- LIFAC North America, Inc., Pittsburgh, PA (United States); ICF Kaiser Engineers, Inc., Pittsburgh, PA (United States); Tampella Power, Marietta, GA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- FC22-91PC90548
- OSTI ID:
- 10135385
- Report Number(s):
- DOE/PC/90548-T11; ON: DE94008715; TRN: 94:003991
- Resource Relation:
- Other Information: PBD: [1993]
- Country of Publication:
- United States
- Language:
- English
Similar Records
LIFAC sorbent injection desulfurization demonstration project
LIFAC Sorbent Injection Desulfurization Demonstration Project. Quarterly Report No. 16, July-September 1994
Related Subjects
20 FOSSIL-FUELED POWER PLANTS
54 ENVIRONMENTAL SCIENCES
SORBENT INJECTION PROCESSES
DEMONSTRATION PROGRAMS
FOSSIL-FUEL POWER PLANTS
RETROFITTING
FLUE GAS
DESULFURIZATION
PROGRESS REPORT
COAL-FIRED GAS TURBINES
INDIANA
010800
200202
540120
WASTE MANAGEMENT
NOXIOUS GAS AND PARTICULATE EMISSIONS
CHEMICALS MONITORING AND TRANSPORT