Advanced Coal-Fueled Gas Turbine Program. Final report
The objective of the original Request for Proposal was to establish the technological bases necessary for the subsequent commercial development and deployment of advanced coal-fueled gas turbine power systems by the private sector. The offeror was to identify the specific application or applications, toward which his development efforts would be directed; define and substantiate the technical, economic, and environmental criteria for the selected application; and conduct such component design, development, integration, and tests as deemed necessary to fulfill this objective. Specifically, the offeror was to choose a system through which ingenious methods of grouping subcomponents into integrated systems accomplishes the following: (1) Preserve the inherent power density and performance advantages of gas turbine systems. (2) System must be capable of meeting or exceeding existing and expected environmental regulations for the proposed application. (3) System must offer a considerable improvement over coal-fueled systems which are commercial, have been demonstrated, or are being demonstrated. (4) System proposed must be an integrated gas turbine concept, i.e., all fuel conditioning, all expansion gas conditioning, or post-expansion gas cleaning, must be integrated into the gas turbine system.
- Research Organization:
- General Electric Co., Schenectady, NY (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC21-86MC23168
- OSTI ID:
- 10132687
- Report Number(s):
- DOE/MC/23168-3040; ON: DE92001114
- Resource Relation:
- Other Information: PBD: Feb 1989
- Country of Publication:
- United States
- Language:
- English
Similar Records
Advanced coal fueled gas turbine system definition: Topical report
Conceptual IGCC power plant design. Final report, September 16, 1981-December 31, 1982. Volume I