skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Laboratory determination of normal operating flow rates with enlarged outlet fittings -- BDF reactors

Technical Report ·
DOI:https://doi.org/10.2172/10108124· OSTI ID:10108124

Experiments have been conducted in the Hydraulics Laboratory, at the request of IPD`s Mechanical Development-A Operation, to determine the energy losses of various enlarged outlet fitting combinations. These experiments were conducted an steady state runs and allow the determination of the normal operating point (flow rate) of a reactor process channel under selected conditions of front header pressure and fuel charge. No attempt is made to make a mechanical or economic evaluation of the particular fitting combinations, although observations were noted which might bear on this evaluation. It is very important for the reader to bear in mind that changing outlet fittings will definitely affect the reactor tube power limits and outlet vater temperature limits. The size of the outlet fittings largely determines the present outlet temperature limits of the old reactors. The flow characteristics of these present fittings cause some degree of pressurization to suppress boiling on the fuel charge and also cause dual Panellit trip protection for certain flow changes and for power surges. Enlargement of the outlet fittings may actually reduce the allowable outlet coolant temperature limits. Since these effects cannot be determined on the apparatus used in these experiments, a complete discussion of this point is not included in this report. However, the seriousness of these effects should be known and carefully analyzed before a final selection of enlarged outlet fittings in made. This report will be one of a series. New reports in the series will be issued as data are obtained for other such outlet fitting combinations or for new concepts of outlet fitting assemblies such as the new nozzle being developed by C. E. Trantz for use on F-reactor stuck gunbarrel tubes.

Research Organization:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
10108124
Report Number(s):
HW-63756-1; ON: DE93003940
Resource Relation:
Other Information: PBD: 2 Feb 1960
Country of Publication:
United States
Language:
English