skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: C-Reactor I and E loading instability limits

Technical Report ·
DOI:https://doi.org/10.2172/10106479· OSTI ID:10106479

The pilot charging of I & E fuel elements has been implemented at C-Reactor under Production Test IP-19-A. It was necessary to provide adequate tube protection against flow interruption by establishing proper trip setting on the Panellit pressure gauges. the administration of these Panellit trip settings is done by trip-before- boiling tube outlet temperature limits, which are similar in principle to the current instability limits. Trip-before-boiling limits for C-Reactor I & E fuel elements loadings are presented in this document.

Research Organization:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
10106479
Report Number(s):
HW-47150; ON: DE93003934
Resource Relation:
Other Information: PBD: 24 Jan 1957
Country of Publication:
United States
Language:
English