Application of integrated reservoir management and reservoir characterization to optimize infill drilling. Quarterly technical progress report, September 13--December 12, 1997
The eighteen 10-acre infill wells which were drilled as part of the field demonstration portion of the project are all currently in service with no operational problems. These wells consist of fourteen producing wells and four injection wells. The producing wells are currently producing a total of approximately 450 bopd, down from a peak rate of 900 bopd. Unit production is currently averaging approximately 2,700 bopd, 12,000 bwpd and 18,000 bwipd. The paper describes progress on hydraulic fracture design, reservoir surveillance, data analysis procedures, and deterministic modeling and simulation.
- Research Organization:
- Fina Oil and Chemical Co., Midland, TX (United States)
- Sponsoring Organization:
- USDOE Assistant Secretary for Fossil Energy, Washington, DC (United States)
- DOE Contract Number:
- FC22-94BC14989
- OSTI ID:
- 661346
- Report Number(s):
- DOE/BC/14989-18; ON: DE98003876; TRN: AHC29814%%13
- Resource Relation:
- Other Information: PBD: [1998]
- Country of Publication:
- United States
- Language:
- English
Similar Records
Application of integrated reservoir management and reservoir characterization to optimize infill drilling. Quarterly technical progress report, March 13--June 12, 1997
Application of integrated reservoir management and reservoir characterization to optimize infill drilling. Quarterly technical progress report, June 13--September 12, 1997
Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling
Technical Report
·
Wed Dec 31 00:00:00 EST 1997
·
OSTI ID:661346
Application of integrated reservoir management and reservoir characterization to optimize infill drilling. Quarterly technical progress report, June 13--September 12, 1997
Technical Report
·
Wed Dec 31 00:00:00 EST 1997
·
OSTI ID:661346
Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling
Technical Report
·
Wed Nov 03 00:00:00 EST 1999
·
OSTI ID:661346