Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling
The eighteen 10-acre infill wells which were drilled as part of the field demonstration portion of the project are all currently in service with no operational problems. These wells consist of fourteen producing wells and four injection wells. The producing wells are currently producing a total of approximately 376 bopd, down from a peak rate of 900 bopd. The four injection wells are currently injecting a total of 140 bwipd. Unit production is currently averaging approximately 2,600 bopd, 12,000 bwpd and 18,000 bwipd.
- Research Organization:
- National Energy Technology Lab. (NETL), Tulsa, OK (United States). National Petroleum Technology Office (NPTO)
- Sponsoring Organization:
- USDOE Office of Fossil Energy (FE) (US)
- DOE Contract Number:
- FC22-94BC14989
- OSTI ID:
- 14181
- Report Number(s):
- DOE/BC/14989-22; TRN: AH200136%%341
- Resource Relation:
- Other Information: PBD: 3 Nov 1999
- Country of Publication:
- United States
- Language:
- English
Similar Records
Application of integrated reservoir management and reservoir characterization to optimize infill drilling. Quarterly technical progress report, March 13--June 12, 1997
Application of integrated reservoir management and reservoir characterization to optimize infill drilling. Quarterly technical progress report, September 13--December 12, 1997
Application of integrated reservoir management and reservoir characterization to optimize infill drilling. Quarterly technical progress report, June 13--September 12, 1997
Technical Report
·
Wed Dec 31 00:00:00 EST 1997
·
OSTI ID:14181
Application of integrated reservoir management and reservoir characterization to optimize infill drilling. Quarterly technical progress report, September 13--December 12, 1997
Technical Report
·
Wed Jul 01 00:00:00 EDT 1998
·
OSTI ID:14181
Application of integrated reservoir management and reservoir characterization to optimize infill drilling. Quarterly technical progress report, June 13--September 12, 1997
Technical Report
·
Wed Dec 31 00:00:00 EST 1997
·
OSTI ID:14181